
Cormorant Energy Storage Project
Cormorant is an American energy project located in Daly City, California. The facility is currently under construction and is anticipated to be fully operational in 2027. Once completed, Cormorant will help meet our country’s rapidly growing demand for electricity by delivering reliable, affordable, locally generated energy. It will strengthen the local economy and support public services through tax revenue, job creation, and long-term investment, while providing the electric system with the capacity needed to keep California homes and businesses powered.
The project features advanced battery storage technology selected for its strong safety performance, enabling electricity from the grid to be stored and then dispatched when it is needed most. This supports grid reliability, reduces strain on energy infrastructure, and helps stabilize electricity prices.
As the long-term owner of the Cormorant facility, Arevon is investing directly in Daly City and the greater Bayshore community, reflecting a sustained commitment to local well-being, equity, and opportunity over the life of the project. We have partnered with more than a dozen local and regional organizations through donations, sponsorships, scholarships, memberships, and volunteer efforts.
Back to all projectsEconomic and Environmental Benefits
175
Construction Jobs
Supporting competitive wages with a focus on local hiring
Leased Land, Preserved
Avoiding permanent changes while protecting the land for future generations
4.2+ Billion
Water Saved Annually
Conserving vital resources
174,000+
CO2 Emissions Avoided Annually
Improving public health
Prioritizing Safety
Safety is a top priority at Arevon, beginning with installing the most advanced technology available today. Compared to many alternative lithium-ion chemistries, Lithium Iron Phosphate (LFP) is less susceptible to thermal events and has become a preferred choice for utility-scale energy storage applications. The majority of our energy storage systems utilize LFP Megapack batteries, which are widely recognized across the industry for their stability and safety performance. Since their commercial introduction in North America, there have been no reported fire incidents involving LFP Megapacks.
Strengthening Communities
At Arevon, we don’t just develop energy projects — we show up, we listen, and we act as partners to the communities that make them possible. That means more than delivering electricity. It means supporting local priorities through volunteering, event sponsorships, and direct community investments.
As part of our long-term commitment, Arevon allocates a portion of each project’s capital cost to community benefits. We focus our resources on three key pillars: alleviating food and housing insecurity, supporting education with a focus on science, technology, engineering, and mathematics (STEM), and promoting public health and safety.
Information and Resources
News and Insights

Release
Arevon Celebrates Construction Progress at its 250 Megawatt/1,000 Megawatt-Hour Cormorant Energy Storage Project in California

Release
Arevon Begins Construction on $600 Million Cormorant Energy Storage Project in California

Press
Nation’s Largest Urban Battery To Take Center Stage Near San Francisco

Insight
What It Really Takes to Build a Battery Energy Storage System

Insight
The Facts About Battery Energy Storage System Safety
Frequently Asked Questions
Explore answers to common questions about energy storage technology.
Project Contact
For questions about the project, please contact:


