Beacon 5

Beacon 5

Cantil

48.2 Gross MWDC
37.8 Gross MWAC
103,620MWh Annual Production Capacity
95,641MT Est. CO2 Avoided Annually
2017-12-08 COD
CEI IV Fund
2016 Year Invested
Beacon 5 is a 48 MW tracker-based photovoltaic power plant located on the in Kern County, California. The electrical generation of the project is fully sold to the Los Angeles Department of Water and Power. 
Beacon 5